Bespoke Object Revisted Progress Blog #1
This week, I made fixes to my original laser-cut layout. This included making sure every piece would be slotted into each other securely for the assembly stage and adding another hole for where it will be hung from the ceiling. I also took measurements of how much acrylic material I had left and laid out the plan accordingly just to make sure that I would have enough material to make the prism.
I have my laser cut appointment on Monday the 17th. Then, I can begin assembling both prisms.
I have also been thinking a lot about how I would hold these pieces together. I like the idea that was mentioned in the proposal about using 'hot' connections, or connections that were not trying to hide that they were connections. I like this idea, and it complements the epoxy method I used by not trying to disguise how it is held together. I have been looking at different ways but the one I like the most is using screws and 90 metal plates. I like this method as it will be very secure and strong enough to hold the piece together while suspended, still relatively lightweight, and the metal is still reflective, which is an essential component of my project.
Comments
Post a Comment